Napoleon Biogas

Over the course of developing the 9.8MW solar array at Campbell Soup Co. in Napoleon, Ohio, BNB was introduced to CH4 Biogas, which was beginning development of an anaerobic digester on an adjacent site. A collaboration began. BNB became a co-owner of the biogas facility at the late stage of its development. Construction of the 2.8MW system, which sits on seven acres, was completed in 2013, and the facility started converting waste streams from Campbell Soup and other area sources into electricity and gas at year end 2013.

 

Project Stats:

  • Location: Napoleon, Ohio
  • Size: 2.8MW
  • Technology: Bigadan A/S digesters and GE Genbacher gensets
  • Status: Operational (2013)