Barilla Solar

BNB was the originating developer of the Barilla Solar array, in Pecos County, Texas, west of Fort Stockton,  having assembled the acreage and secured an interconnection agreement. BNB sold the development to First Solar in 2013. The site, directly adjacent to the existing Barilla substation, is reported to have one of the best solar resources in the state. First Solar has begun construction on Phase 1 of the project; a 22MW array is expected to begin commercial operation in mid-2014.

 

Project Stats:

  • Location: Pecos County, Texas
  • Size: 22MW (Phase 1)
  • Technology: First Solar panels
  • Status: Under construction